coal dragline machine with load cell

Coal mine dragline makes a big move YouTube

Coal mine dragline makes a big move YouTube

13million pound dragline makes its longest walk ever, from one mining area to another in North Dakota. Dragline is owned by The Coteau Properties ..

ReliabilityCentered Maintenance of Rapier Dragline for Optimizing ...

ReliabilityCentered Maintenance of Rapier Dragline for Optimizing ...

The dragline considered for this study is a Rapier W2000 Walking Dragline, with a bucket capacity of 24 m 3, boom length 96 m, operating radius 81 m, dump height m, and digging depth up to m. Draglines are massive machines commonly used in opencast coal mining to strip overburden, revealing the targeted minerals for extraction . In ...

Case studies: coal loading; dragline computer; mine performance ...

Case studies: coal loading; dragline computer; mine performance ...

article{osti_, title = {Case studies: coal loading; dragline computer; mine performance; exploration; soils package}, author = {Gunderson, R}, abstractNote = {Arrivals and departures at Port Kembla coal export terminal in Australia will be monitored by a computer which will be used for stockpile management and to monitor events such as conveyor start sand stops and antipollution spray ...

PDF DRAGLINE PRODUCTION RATES USING DATA RECORDERS Colorado School of Mines

PDF DRAGLINE PRODUCTION RATES USING DATA RECORDERS Colorado School of Mines

studied were identified to be the machine in use, the dig mode employed, the material being excavated, the swing ... Table Dragline D902 Mean Load Times.....6 7 Table Mean Load Times With 95% Confidence ... such example is a coal mine in North Dakota which employs two walking draglines, an electric shovel, a front end ...

Moving Mr. Tom: one of the largest coal mine draglines in the

Moving Mr. Tom: one of the largest coal mine draglines in the

Sporting flags representing the United States, Alabama, and Vietnam POWMIAs, Mr. Tom is a walking dragline with two sledlike feet that move it forward about 13 feet at a time. The dragline ...

1967 Big Muskie (BucyrusErie 4250W) Dragline Crane Blogger

1967 Big Muskie (BucyrusErie 4250W) Dragline Crane Blogger

In 1966, an exciting project started at the factories of the Bucyrus Erie Co. the engineering and building of the components of what would be one of the world's largest earthmoving machines ever built, "Big Muskie." Central Ohio Coal Co. had chosen this immense machine because the mine property extended over 110,000 acres of hilly terrain and made the use of a dragline versus a ...

(PDF) Underground extraction of contiguous coal seams/sections ...

(PDF) Underground extraction of contiguous coal seams/sections ...

Abstract and Figures. Underground depillaring of contiguous coal seams/sections is a difficult problem, which becomes even more complex if the interburden/parting between them is thin ...

(PDF) IRJET CASE STUDY ON DRAGLINE

(PDF) IRJET CASE STUDY ON DRAGLINE

A dragline is most efficient for excavating Coal India Limited (CIL), now has standardized the material below the level of their base. It can dig draglines in two sizes, namely 10/70 and 24/96 for their mines. Most mines depend on the dragline 24 hours/day, 7 above itself also but inefficiently.

PDF SCIENCE OF MINING MACHINES Performance Analysis of a ... Springer

PDF SCIENCE OF MINING MACHINES Performance Analysis of a ... Springer

MACHINES Performance Analysis of a Digitally Retrofitted Ward Leonard Control Dragline—A Case Study in Coal Mine P. Manikandana,b* and T. Maitya ... consumption has been calculated as energy consumption per cubic meter of load movement by the dragline and is tabulated in the same table. The average specificenergy consumption for one year ...

Development of a 3500Tonne Field Robot Jonathan M. Roberts, Peter I ...

Development of a 3500Tonne Field Robot Jonathan M. Roberts, Peter I ...

This paper presents a broad overview of the issues involved in the development of a physically large and complex field robotic system—a 3500tonne mining machine (dragline). Draglines are "walking cranes" used in openpit coal mining to remove the material covering a coal seam.

Digging big the world's biggest draglines Mining Technology

Digging big the world's biggest draglines Mining Technology

The suspended load capacity of the dragline is up to 95,000kg. ESH OMZ's ESH walking dragline is fitted with a 30m³ capacity bucket and has a boom length of 110m. The dragline has a base diameter of 18m and working weight 3,420t. The maximum dumping height and digging depth of the ESH are and 53m respectively.

Industrial History: The Big John dragline (BE 1570W) is being ... Blogger

Industrial History: The Big John dragline (BE 1570W) is being ... Blogger

I don't think they ran out of coal. In 1999, the US Army Corps of Engineers got caught cheating and eventually quit granting mining permits because of environmental impact issues. [youtube comments] It appears that through the magic of bankruptcies, the coal corporations are dodging pensions, health plans and site cleanup. "Today, Hobet is ...

Bayesian Network Approach for Dragline Reliability Analysis ... Springer

Bayesian Network Approach for Dragline Reliability Analysis ... Springer

The dragline sits on the top of the overburden bench, usually 50 m or so wide on the highwall side and excavates the material in front of itself to dump it on the strip's low wall or spoil side to uncover the coal seam. A dragline can easily dump the excavated overburden materials to a distance of around 100 m from the machine.

Realtime volume estimation of a dragline payload ResearchGate

Realtime volume estimation of a dragline payload ResearchGate

This paper presents a method for measuring the inbucket payload volume on a dragline excavator for the purpose of estimating the material's bulk density in real time. Knowledge of the payload's ...

A real steel fabrication shop Metalworking News

A real steel fabrication shop Metalworking News

Before and after One of the biggest individual fabrications that CEC Fabrication Construction regularly refurbish is dragline buckets that are used on the coal mines. Each individual unit can weigh up to 68 tons. It is an Australian designed product that can take a load of 93 cubic metres of coal per drag.

Preventive Replacement Decisions for Dragline Components Using ... MDPI

Preventive Replacement Decisions for Dragline Components Using ... MDPI

It was detected from failure statistics that operations of Dragline1 and Dragline2 were halted for 938 and 903 times due to failures, yielding total breakdown duration of 13,954 and 16,471 h, respectively. Quantitative contribution of each subsystem to maintenance numbers and maintenance breakdowns can be viewed in Figure 2.

Moving and Maintaining the World's Biggest Diggers | E MJ

Moving and Maintaining the World's Biggest Diggers | E MJ

Brad Gadt, heavy equipment outage and relocations manager at Luminant Mining, explained at Mining Media's Haulage Loading 2015 conference how the multidragline move grew from two machines to four. Initially, plans were to move two Caterpillar 8750 draglines from one site to another—one by walking it, the other by some means of transport.

Specalog for Cat Terrain for Draglines AEHQ617502 Scene7

Specalog for Cat Terrain for Draglines AEHQ617502 Scene7

of a dragline to the mining business and provides Terrain for draglines to improve productivity and safety. Machine performance, productivity and payload are monitored and organized in reports to optimize dragline output and minimize operating costs. Production Monitoring Production Monitoring provides realtime tracking and

The size of the dragline is based on the capacity of Course Hero

The size of the dragline is based on the capacity of Course Hero

CBET01 301P. The size of the dragline is based on the capacity of the drag bucket. A 15 yd dragline has a bucket capacity of 15 yd 3 . Typically draglines are in the range of 60 150 yd. The largest one ever built had a bucket capacity of 220 yd 3 . It could fill the bucket, swing it to the dump point nearly 300' from the machine, dump ...

PDF Case Study on Dragline Irjet

PDF Case Study on Dragline Irjet

load piled up material as a shovel. Draglines are ... the pullback method would In a twodragline system, one machine must operate at the pace set by the other. seem to be a solution. ... be beyond the capacity of the dragline to spoil off the coal by any of the previous methods described. In this case, a secondary dragline can be ...

Critical Analysis of Tandem Dragline Performance in Open Cast Coal ...

Critical Analysis of Tandem Dragline Performance in Open Cast Coal ...

In an Indian study for a large dragline operated surface coal mine, a 40% gain in OE in terms of mining rate (m3/hr) resulted in a gain in EE with an annual reduction of GHG, TSP, and PM10 ...

Dragline and Dozer Productivity Orica

Dragline and Dozer Productivity Orica

Type the code from the image. Achieving high productivity from large capital equipment items such as draglines depends on consistent fragmentation and muckpile presentation to reduce rehandle and unnecessary movements. By careful planning and blast design, cast to final spoil can be maximised without increasing the risk of flyrock or overpressure.

BNI Coal commissions 31 million dragline in North Dakota

BNI Coal commissions 31 million dragline in North Dakota

A coal mining company in Center commissioned a 31 million dragline Monday and is about six weeks from putting the massive coal miner to use. BNI Coal hosted the ceremony at its Center Mine. The ...

New Options for Dragline Maintenance Optimize Production Performance ...

New Options for Dragline Maintenance Optimize Production Performance ...

The problem stemmed from a preexisting deficiency of the OEM design in this area and the accumulation of fatigue damage through a long service for the machine. Further, in an effort to increase production, the mine was intending to increase the suspended load and was concerned about further exacerbating the problems in this area.

Dragline Excavator Uses | Dragline in Mining | American Mine Services

Dragline Excavator Uses | Dragline in Mining | American Mine Services

1. Standard Lift Crane. Dragline excavator uses that operate as a standard lifting crane are built offsite and transported to the mine. They are able to be dismantled and reassembled. Within civil engineering, standard lift cranes with winch drums can be used to build bridges, ports, and roads. 2.

User's Manual for Premining Planning of Eastern Surface Coal ... EPA

User's Manual for Premining Planning of Eastern Surface Coal ... EPA

66 26 A 45CubicYard Dragline at Work in a Pennsylvania Coal Operation 70 27 Pit Layout at BucyrusErie 4250W Operation 71 28 A 90CubicMeter Dragline With a 90Meter Boom 72 29 Plan and Section Views of a BucyrusEris 1950B Pit • • • 73 30 Details of a Shovel Pit 74 31 Plan and Section Views of a Dragline and BucketWheel Excavator ...

Dragline Excavator royaltyfree images Shutterstock

Dragline Excavator royaltyfree images Shutterstock

Quarry Mining Machines. Bucket Wheel Excavator, Dragline Excavator, Dragline Excavator, Track Drilling Machine, Biggest Hydraulic Mining Excavator Large Quarry Dump Truck. ... a huge dragline strips overburden to reach the lignite seam in south Texas to provide local base load energy for Texas power plants, along access road to I 37 in Atascosa ...

Ursa Major (excavator) Wikipedia

Ursa Major (excavator) Wikipedia

Ursa Major in 2009. The Ursa Major (lit. Great Bear) at Black Thunder Coal Mine, Wyoming, is the largest dragline excavator currently in use in North America and the third largest ever built. [1] [2] It is a BucyrusErie 2570WS model and cost US50 million. The Ursa Major was one of five large walking draglines operated at Black Thunder, with ...

Mining Operations Committed to LongTerm Success North American Coal

Mining Operations Committed to LongTerm Success North American Coal

With over 100 years of experience, our mining capabilities are extensive. We leverage our vast experience in true partnership to achieve your goals. As the largest lignite producer in the, we operate mines with annual production levels ranging from a few hundred thousand tons per year to more than 10 million. We specialize in reserve ...

A Critical Investigation of Digging Time Segment of Draglines in a ...

A Critical Investigation of Digging Time Segment of Draglines in a ...

Dragline is highly capital intensive equipment to procure, operate and maintain in any surface mining operation. Given this, every second of operation of this capital intensive equipment is absolutely important. As such, it is imperative to optimize the overall cycle time of this equipment in order to reap the benefits of this equipment to the fullest extent. Even a small improvement in the ...